- Automatic intake: new rows that match your rules become Gradial Tasks. Match on dropdown values or the person in a contact column, or take every new row.
- Your intake rules: Gradial checks each request against your team’s own intake skills. It then comments to the requester with anything that’s missing.
- Works on the row: Gradial comments, updates cells, and adds subrows to split a request into separate pieces of work.
- Reply to re-check: requesters fix the row and reply with
@gradial, and Gradial checks it again. - Safe by design: Gradial only works on sheets you set up for it. It never deletes, shares, or sends anything, and it leaves formula and locked cells alone.
Access: Must be enabled for your organization. Contact your Gradial team to get access.
Prerequisites
- Permission to manage Gradial settings and integrations.
- A Gradial Workspace and Environment for incoming Tasks.
- A Smartsheet plan that includes API access.
- A dedicated Smartsheet service user, such as Gradial, with its own email address.
Set up the service user
Gradial posts every comment and edit as the user who owns the API token.- Create a Smartsheet user for the integration, for example
[email protected]. - Share each intake sheet with this user as Editor. Share as Admin if your intake skills should let Grady add columns.
- Sign in to Smartsheet as this user.
- Open your account menu and go to Personal Settings → API Access.
- Select Generate new access token, name it, and copy the token.
Connect Smartsheet to Gradial
1
Connect
Open Settings → Integrations and choose Smartsheet. Enter an Integration name. Under Smartsheet region, pick where your account lives: United States (smartsheet.com), Europe (smartsheet.eu), or Australia (smartsheet.au). Paste the token into Smartsheet service user API token and validate the connection. Then continue to Routing.
2
Add a route for each sheet
Select Add route, then enter a Route name and an optional Description. Enter the Sheet ID, which you’ll find in Smartsheet under File → Properties. Each route reads one sheet, so add a route for each sheet.
3
Choose which rows become Tasks
Under Triggers, select Add trigger. Pick a single-select dropdown column or a contact column, choose Is or Is not, and pick a value or a person. A row becomes a Task when it meets every trigger. A route can have up to 10 triggers.Leave Triggers empty to take every new row. With no triggers, only rows added after you turn the route on become Tasks.
4
Choose the destination and skills
Select the Workspace and Environment for this route’s Tasks. Under Skills, choose the intake skills Grady should use on every Task from this route. These skills say what a complete request looks like, such as which fields must be filled in and which files to attach. The sheet needs no special columns.
5
Test, review, and turn on
Select Test query to see which rows the route will pick up. Review the Route summary, save, and turn the route on.
How a request runs
- A requester adds a row to the sheet.
- On its next check, Gradial picks up the row, creates one Task in the route’s Workspace, and comments “Gradial has received this task” on the row.
- Grady checks the request against the route’s skills. It comments on the row and tags the requester. The comment either says the request is complete or lists what’s missing.
- The requester updates the row and adds a comment that includes
@gradial. On its next check, Gradial picks the Task back up and checks again. - Grady keeps working on the same Task. It can update cells, add subrows such as “Email build” and “Email QA”, and comment as the work moves along.
@gradial does, even after the row no longer matches the triggers.
What Grady can do on the sheet
Rows and subrows that Grady adds never become Tasks. Your intake skills decide which cells Grady writes and when.
Check a route’s health
Once you save a route, its settings show the latest scan. You’ll see when it finished, how long it took, and how many rows matched or failed. Each failed row is listed with the reason.- Sync route runs the route right away without changing its schedule.
- Sync one row syncs one row by its row number. The row must meet the route’s triggers.
Limits
- Gradial checks sheets about every 5 minutes.
- Subrows never become Tasks.
- Sheets can have up to 20,000 rows. With many large sheets, some may wait until the next check.
- Comments are plain text and are visible to everyone who can see the sheet.
Troubleshooting
Contact your Gradial team or email [email protected] if issues persist.